MW LOS Survey

The main purpose of LOS surveys is to ensure an MW connection to the sites to determine a Line of Site clearance. It is the LOS survey. It is completed by physically inspecting areas between every two sites and the chosen sites for acquisition.

This survey is extremely important as any failure of LOS could cause delays in the project and then a loss. LOS survey is conducted using the following steps:

Collect Nominals for the proposed location as well as those of the closest locations to which the customer wants to propose the LOS Verification of connectivity and connectivity
Note latitude, longitude and building information obstruction data, as well as the related terrain data using the LOS Survey template
Create a LOS Path profile for the Link that is proposed Link with the help of Pathloss 4.0
Create LOS reports for your suggested Link using Pathloss 4.0. Conduct a physical inspection of the hop to find any obstructions in the field and then verify your LOS path profile